Skip to content
Monday – Friday: 7 a.m. – 5 p.m.(201) 555-0101

Services

Risers and stacks, replaced in occupied buildings

Each service is a line in the proposal, so a board can approve the ones it needs now and schedule the rest.

  • Domestic water risers

    Cold and hot supply lines replaced floor to floor, with a new shutoff valve for every unit.

    • Line by line, inside a posted window

    • Branches reconnected and tested at each unit

  • Drain and waste stacks

    Cast iron and galvanized stacks replaced from the basement to the roof vent.

    • Camera scope before the proposal

    • Cleanouts added where the old stack had none

  • Hot-water return lines

    Recirculation lines replaced with the supply, insulated and rebalanced.

    • Tied back to the building's existing pump

    • Insulation on every run we open

  • Unit shutoffs and branch lines

    A valve that works lets one unit be repaired without closing a line.

    • Isolation valves at each unit's connection

    • Labeled so the next plumber knows

  • Pressure tests and diagrams

    Every line is pressure tested before the walls are closed, and the riser diagram is marked up as built.

    • Test results go in the closeout binder

    • The diagram is filed with the building's records

  • Night and weekend work

    Lobby, retail and common-area lines are worked when the building is quiet.

    • Scheduled in the proposal, not added later

    • Night crews report to the same project manager

Walls

Opened where the pipe is, closed to the finish you agreed

The proposal names the wall finish for every unit: primed drywall, tile left to the owner, or a patch matched by a painter the manager already uses.

Opening a wall behind a vanity is not the same as opening a kitchen chase. We photograph each opening before we cut, and the photos are in the daily log.

What the proposal says

  • Wall finish named in the proposal, by unit type

  • Photos before and after each opening

  • Tile, paint and wallpaper left to the owner unless the proposal says otherwise

A gutted room with timber and steel stud framing, exposed supply lines and conduit against a brick wall

Limits

Work we hand to others

A riser job crosses other trades' lines. We coordinate with them and do not do their work.

Fire sprinkler risers and gas piping are separate licenses. Boiler and chiller work belongs to a heating contractor. When a riser closet holds one of these, we mark it in the survey and arrange the shutdown with the firm that holds it.

Overhead steel pipe on a hanger with a brass gate valve

Which lines does your building need?

The survey sorts the lines into replace now, watch and leave alone.