Skip to content
Monday – Friday: 7 a.m. – 5 p.m.(201) 555-0101

Pricing

How pricing works

A riser job has no standard price. This is what moves the number, and when you will have it in writing.

  • What decides the price

    The building's own pipe and the access to it set the price more than the pipe itself.

    • Number of riser lines and floors

    • Pipe material, and how corroded it is

    • How many units each line crosses

    • Wall finish to be restored

    • Night or weekend work

  • What the proposal covers

    Included: pipe, valves, opening and closing walls to primed drywall, permits, testing and the closeout binder.

    • Not included: tile, paint, wallpaper and cabinets

    • Not included: asbestos abatement, if it is found

  • What happens at the survey

    We walk the riser closets with the manager, open access points and scope the drains. The survey and report are quoted in writing before we begin.

    • If the board signs, the survey fee is credited toward the work

  • How and when you pay

    Payments are tied to finished riser lines, not to calendar dates.

    • The schedule is in the proposal

    • Each payment follows a line that has passed its pressure test

  • If the job changes

    A change is priced in writing before the work on it starts. The board or its manager signs it.

    • Found conditions are reported the same day

    • Nothing is added to a final bill that was not signed

  • When you get the number

    Before the board votes, in a written proposal priced by riser line.

    • Not at the survey and not by phone

    • A second schedule option when the building allows it

Every figure in a proposal is written, by riser line, before the board votes.

After hours

Night work is scheduled, and priced in the proposal

Some lines can't be worked while the lobby is open or the shops are busy. Night crews take those lines on dates set in the proposal, so the cost of night work is known before the vote.

The office line is answered during office hours. For anything a building needs outside them, the manager has the project manager's number from the notice letter.

Ask for a written proposal

Start with a survey. The proposal follows it, priced by riser line.