Skip to content
Monday – Friday: 7 a.m. – 5 p.m.(201) 555-0101
Row of old industrial valves with red handwheels in a boiler plant room

Condo and multifamily repiping, Jersey City

Riser replacement, planned for the whole building

We replace domestic water risers and drain stacks in condos, co-ops and multifamily buildings across Hudson County. Every project starts with a written proposal and a notice letter to each unit.

  • Written proposal first
  • A letter to every unit
  • Closeout binder

The board-ready project

A project your board can vote on

Five steps, in the order a board needs them. Each one ends in a document you can put in the building file.

  • Step 1

    Inspect

    We walk the riser closets, the basement and the roof vents, open a few access points and scope the drains. What we find goes into a written condition report with photos.

    • Pipe material, by riser line

    • Shutoff valves that hold, and ones that don't

    • Which units each line passes through

  • Step 2

    Propose

    A written proposal the board can vote on and compare with any other bid. It is priced and scheduled by riser line, and says what the walls are left like.

    • Scope and schedule for each line

    • The access each unit must give

    • Payments tied to finished lines

    • License, insurance certificate and references for the board packet

  • Step 3

    Notice

    Before any water is shut off, every affected unit gets a letter. In plain words, it tells a resident when, for how long, and what to do.

    • The day their line is worked and the hours water is off

    • What to clear: the closet, the cabinet under the sink, the wall behind

    • A name and a phone number that is answered on access days

    • What to do if no one can be home

  • Step 4

    Work

    One riser line at a time, inside the posted window. Night crews take the work a building can't have during the day. The manager gets a log every working day.

    • Shutoff windows posted in the lobby

    • Walls closed to primed drywall at the end of each line

    • Floors and common areas protected

  • Step 5

    Close out

    Pressure test and inspection, a punch list walked with the manager, and a closeout binder for the building file.

    • Permit sign-off and test results

    • A marked-up riser diagram

    • The final lien release

Staging

One riser line at a time, or the whole building at once

Boards ask which one to choose. Here is how the two compare in an occupied building.

One riser line at a time, or the whole building at once
Whole building at onceOne line at a time
WaterWhole building at onceOff for every unit togetherOne line at a timeOff for one line, inside a posted window
Residents affected a dayWhole building at onceAll of themOne line at a timeThe units stacked on that line
NoticeWhole building at onceOne building-wide letterOne line at a timeA letter to the affected units, with the dates for their line
LengthWhole building at onceShorter overall, harder on each householdOne line at a timeLonger overall, shorter for each household
FitsWhole building at onceVacant buildings, or very small onesOne line at a timeOccupied buildings with several riser lines

Access

Most of a riser job is getting to the pipe

Risers sit in closets, behind vanity walls and in kitchen chases. We map which units each line crosses before we write the proposal, so the access each household gives is known in advance.

  • Mapped by line

    A drawing of every riser line and the units on it, kept with the condition report.

  • Walls opened and closed

    Opened where the pipe is, closed to primed drywall. Tile, paint and wallpaper are named in the proposal.

  • Floors and lobbies covered

    Corridors, elevators and lobby floors are protected before the crew carries pipe in.

  • Logged every day

    The property manager gets a short log of what was done and what is next.

A white fire sprinkler riser with pressure gauges and valves on a building wall

The board packet

What the board gets before it votes

Put these in the board packet next to the proposal. Ask any bidder for the same.

  • Licenses

    • Plumbing ContractorVerify

      NJ Lic. 000000 · New Jersey State Board of Examiners of Master Plumbers

      Can pull plumbing permits for the building's work

  • Insurance

    • General liability and workers' compensation

      A certificate for the building file comes with every proposal

  • In the packet

    • Condition report

      Photos and notes, by riser line

    • Written proposal

      Scope, schedule and payments by line

    • Draft notice letter

      For the board and manager to approve

    • References

      Other buildings, on request

Scope

What we replace

Three kinds of pipe do most of the damage in an older building, and each gets its own line in the proposal.

  • Domestic water risers

    Cold and hot supply lines that run floor to floor, replaced line by line with a new shutoff valve at every unit.

  • Drain and waste stacks

    Cast iron and galvanized stacks that leak, crack or clog, replaced from the basement to the roof vent.

  • Hot-water return lines

    Return lines corrode first. They are replaced with the supply, insulated and tied back to the building's pump.

Service area

Buildings we go to

Hudson County, with Newark, and the Bergen County towns along the river. If your building is somewhere else, call before you assume.

Hudson County

  • Jersey City
  • Hoboken
  • Bayonne
  • Weehawken
  • West New York
  • Guttenberg
  • North Bergen
  • Secaucus
  • Kearny
  • Harrison

Essex and Bergen counties

  • Newark
  • Fort Lee
  • Palisades Park
  • Ridgefield

We don't work in New York City, where a New York license applies, or south of Elizabeth. For a building there, we can point you to who to call.

ZIP codes: 07302, 07304, 07305, 07306, 07307, 07310, 07311, 07030, 07002, 07086, 07093, 07094, 07047, 07029, 07032, 07024, 07102

Boards and managers

What a project looks like from the board table

“The notice letter was what residents kept on the fridge. Every unit knew the day, the hours and who to call before anyone knocked.”

Grazyna V.Board president, condo association

“The proposal broke the job out by riser line, so we could set it next to the other bid and compare them line for line.”

Takashi O.Board treasurer, co-op

“The daily log was in my inbox before I asked for it. Residents had their questions answered before they came to my office.”

Zahra J.Property manager, mid-rise rental

Sample reviews.

Questions

Before the first survey

Does anyone have to move out?

No. Water is shut off for one riser line at a time, inside a window that is posted in the lobby. Units on other lines keep their water.

How long is a unit without water?

The notice letter gives the hours for that unit's line. The proposal states the window for each line before the board votes.

What if you find asbestos or a surprise in the wall?

We stop, tell the property manager the same day, and put any added work in writing as a priced change. The board decides before anything continues.

Do you pull the permits?

Yes. Permits are pulled in the licensed firm's name, and the inspection dates go in the notice letter.

Who talks to residents?

A project manager assigned to the building. Their name and phone number are on the notice letter.

How should a board compare bids?

Ask each bidder for pricing by riser line, what the walls are left like, how many days of access each unit gives, and when payments are due.

Property managers and boards

Request a building survey

Tell us about the building. A project manager will call to set a survey date.

Hours
Monday – FridayToday
7 a.m. – 5 p.m.
You are

The survey and condition report are quoted in writing before we start. If the board signs, the survey fee is credited toward the work.